Toggle navigation
Matunda
The kids of Kenya
Home
Matunda
Kids
Pictures
How to help
Sponsors
Links
Contact
Responsibility
Privacy
Tassen voor Matunda
May
01
2023
Help Mercy go to university
Go to the site
Go Fund Me
English
Nederlands
Zoeken
Search for:
“Keying”, a line between the stones
Repairing the desks
Slide it into place
He only has one wrench
The primer
Mixing cement by hand
The kitchen
Chipping of irregularities
The gutter on the toilets roof
Flattening the plaster
Knocking out morter
Digging for the electrical line
Ready for ceiling boards
A truck delivers the sand outside
Preparing for painting
They throw the plaster on
This outside wall is almost finished
Steady standing!
The front gate
Putting up the ceilig
Plastering
Throwing the plaster on
Just a blade, no hacksaw
Above the toilets, with water tank
The new chicken coop
He doesn’t have a kit gun
The leaky gutter
Mixing cement
Filling our 5,000 liter tank
Fixing the roof on the kitchen
A switch for the water pump
Look closely for the “level”, water in a hose
Melting the PVC for a connection
Wood for the ceilings
Close up of the toilets outside
Joash and Mercy
Close up of the toilets
Electrician installing meters