Toggle navigation
Matunda
The kids of Kenya
Home
Matunda
Kids
Pictures
How to help
Sponsors
Links
Contact
Responsibility
Privacy
Joseph
Joseph
English
Nederlands
Zoeken
Search for:
Ready for ceiling boards
The kitchen
Knocking out morter
“Keying”, a line between the stones
Digging for the electrical line
Mixing cement
Wood for the ceilings
The primer
Mixing cement by hand
He only has one wrench
Flattening the plaster
The front gate
Just a blade, no hacksaw
Look closely for the “level”, water in a hose
The new chicken coop
Chipping of irregularities
A switch for the water pump
Above the toilets, with water tank
Plastering
Close up of the toilets outside
He doesn’t have a kit gun
This outside wall is almost finished
The gutter on the toilets roof
Slide it into place
Preparing for painting
Repairing the desks
Throwing the plaster on
Close up of the toilets
Fixing the roof on the kitchen
Filling our 5,000 liter tank
Melting the PVC for a connection
Joash and Mercy
They throw the plaster on
Steady standing!
A truck delivers the sand outside
Electrician installing meters
Putting up the ceilig
The leaky gutter