Toggle navigation
Matunda
The kids of Kenya
Home
Matunda
Kids
Pictures
How to help
Sponsors
Links
Contact
Responsibility
Privacy
Joseph
Joseph
English
Nederlands
Zoeken
Search for:
This outside wall is almost finished
Throwing the plaster on
A switch for the water pump
Putting up the ceilig
Wood for the ceilings
Above the toilets, with water tank
Close up of the toilets outside
The kitchen
Digging for the electrical line
Close up of the toilets
He doesn’t have a kit gun
Plastering
Repairing the desks
Filling our 5,000 liter tank
The primer
Electrician installing meters
Just a blade, no hacksaw
Steady standing!
Knocking out morter
They throw the plaster on
Mixing cement by hand
The gutter on the toilets roof
The new chicken coop
Joash and Mercy
Flattening the plaster
Mixing cement
The leaky gutter
Fixing the roof on the kitchen
Look closely for the “level”, water in a hose
Chipping of irregularities
Ready for ceiling boards
Slide it into place
A truck delivers the sand outside
The front gate
He only has one wrench
“Keying”, a line between the stones
Preparing for painting
Melting the PVC for a connection