Toggle navigation
Matunda
The kids of Kenya
Home
Matunda
Kids
Pictures
How to help
Sponsors
Links
Contact
Responsibility
Privacy
Breaking news!
Going to school
Dec
20
2011
Not relevant in English (Dutch taxes!)
English
Nederlands
Zoeken
Search for:
Flattening the plaster
A switch for the water pump
Mixing cement by hand
The gutter on the toilets roof
This outside wall is almost finished
Plastering
Preparing for painting
Ready for ceiling boards
Filling our 5,000 liter tank
“Keying”, a line between the stones
Putting up the ceilig
The kitchen
The leaky gutter
Steady standing!
Above the toilets, with water tank
Wood for the ceilings
Digging for the electrical line
Fixing the roof on the kitchen
Mixing cement
He only has one wrench
Close up of the toilets
Chipping of irregularities
Melting the PVC for a connection
Repairing the desks
Look closely for the “level”, water in a hose
The primer
Just a blade, no hacksaw
Joash and Mercy
Electrician installing meters
Close up of the toilets outside
They throw the plaster on
The new chicken coop
Knocking out morter
Throwing the plaster on
He doesn’t have a kit gun
A truck delivers the sand outside
The front gate
Slide it into place