Toggle navigation
Matunda
The kids of Kenya
Home
Matunda
Kids
Pictures
How to help
Sponsors
Links
Contact
Responsibility
Privacy
Yearly Report 2020
This report is coming soon.
English
Nederlands
Zoeken
The front gate
Putting up the ceilig
Electrician installing meters
Close up of the toilets outside
The gutter on the toilets roof
Slide it into place
Plastering
This outside wall is almost finished
The primer
Knocking out morter
Wood for the ceilings
“Keying”, a line between the stones
A switch for the water pump
Throwing the plaster on
Look closely for the “level”, water in a hose
Filling our 5,000 liter tank
The leaky gutter
Fixing the roof on the kitchen
Digging for the electrical line
Close up of the toilets
The new chicken coop
He only has one wrench
Mixing cement by hand
Ready for ceiling boards
They throw the plaster on
Joash and Mercy
Above the toilets, with water tank
A truck delivers the sand outside
Mixing cement
The kitchen
Preparing for painting
Melting the PVC for a connection
He doesn’t have a kit gun
Chipping of irregularities
Just a blade, no hacksaw
Flattening the plaster
Steady standing!
Repairing the desks