Matunda  

Matunda

The kids of Kenya

  • Home
  • Matunda
  • Kinderen
  • Foto’s
  • Helpen
  • Sponsors
  • Links
  • Contact
  • Verantwoording
  • Privacy

Jaarverslagen

Jaarverslag 2018

Jaarverslag 2019

Jaarverslag 2020

  • English
  • Nederlands

Zoeken

Plastering


“Keying”, a line between the stones
A switch for the water pump

Throwing the plaster on


He only has one wrench



Wood for the ceilings





Chipping of irregularities


Ready for ceiling boards
Slide it into place


Fixing the roof on the kitchen


Close up of the toilets
Putting up the ceilig


This outside wall is almost finished


He doesn’t have a kit gun



A truck delivers the sand outside



Digging for the electrical line
Repairing the desks


Melting the PVC for a connection


Steady standing!


Knocking out morter





The kitchen


Filling our 5,000 liter tank

The gutter on the toilets roof



The leaky gutter


Close up of the toilets outside



Preparing for painting




Just a blade, no hacksaw



Look closely for the “level”, water in a hose



They throw the plaster on



Joash and Mercy


The new chicken coop



Electrician installing meters

Above the toilets, with water tank

Flattening the plaster


The primer



The front gate
Mixing cement by hand





Mixing cement











  • Home
  • Matunda
  • Kinderen
  • Foto’s
  • Helpen
  • Sponsors
  • Links
  • Contact
  • Verantwoording
  • Privacy

© 2025 Matunda.

Made with by Graphene Themes.